A Client temporarily required powerful cooling inside a packed Portacabin (within a warehouse area) with little available floor space.
A Client temporarily required powerful cooling inside a packed Portacabin (within a warehouse area) with little available floor space.
We of course, found a Solution!
A ‘Blizzard’ was sited outside and powerful freezing cold air was ducted into the cabin. The rejected air was simply discharged from the top of the Blizzard into the Large Warehouse Area.
CLIENT:
BAE Systems
CONTRACTOR:
Turrell Ltd